Peserta Wisuda tahun 2014
Program Studi Fisika
| Periode | NIM Nama Peserta  | 
        Angkatan | IPK | Tgl Lulus No Ijasah  | 
        Judul T.A/Skripsi/Tesis/Disertasi | 
|---|---|---|---|---|---|
| 80 | 103224023 JAMALUDIN  | 
			2010 | 3.1 | 2014-05-13 23.00566.14  | 
			PERANCANGAN SENSOR DIGITAL ULTRASONIK BERBASIS MIKROKONTROLER UNTUK PENGUKURAN KETINGGIAN PERMUKAAN AIR | 
| 81 | 10030224018 MOH.KOSIM  | 
			2010 | 3.21 | 2014-08-25 23.01017.14  | 
			STUDI PENGARUH PENAMBAHAN SiO2 TERHADAP POROSITAS γ-Al2O3 | 
| 81 | 103224038 HANIF BASKARA  | 
			2010 | 3.26 | 2014-08-19 23.00990.14  | 
			PERANCANGAN SISTEM MONITORING KUALITAS UDARA MENGGUNAKAN MODUL RF (RADIO FREQUENCY) XBEE | 
| 80 | 103224034 SHERLY ARDHYA GARINI  | 
			2010 | 3.3 | 2014-05-13 23.00569.14  | 
			RELOKASI HIPOSENTER GEMPA BUMI DI SULAWESI TENGAH DENGAN MENGGUNAKAN METODE GEIGER DAN COUPLED VELOCITY-HYPOCENTER | 
| 80 | 10030224023 JAMALUDIN  | 
			2010 | 3.1 | 2014-05-13 23.00566.14  | 
			PERANCANGAN SENSOR DIGITAL ULTRASONIK BERBASIS MIKROKONTROLER UNTUK PENGUKURAN KETINGGIAN PERMUKAAN AIR | 
| 80 | 10030224201 INTAN GITA SABRINA  | 
			2010 | 3.24 | 2014-05-13 23.00570.14  | 
			PENGUKURAN NILAI RESISTIVITAS UNTUK MENENTUKAN TITIK GROUNDING PADA DESA DOROPETI KABUPATEN DOMPU NUSA TENGGARA BARAT | 
| 80 | 10030224017 JIHAN NIA SHOHAYA  | 
			2010 | 3.37 | 2014-05-09 23.00563.14  | 
			MODEL KECEPATAN 1-D GELOMBANG P DAN RELOKASI HIPOSENTER GEMPA BUMI DI BENGKULU MENGGUNAKAN METODE COUPLED VELOCITY HYPOCENTER | 
| 81 | 103224008 TRI UTAMI FAIZATIN  | 
			2010 | 3.25 | 2014-08-25 23.01018.14  | 
			PEMETAAN DAERAH RAWAN PETIR CLOUD TO GROUND POSITIF WILAYAH PASURUAN TAHUN 2012 MENGGUNAKAN METODE INVERSE DISTANCE WEIGHTED | 
| 80 | 10030224032 DEWI INDAH N  | 
			2010 | 3.61 | 2014-05-13 23.00568.14  | 
			MONITORING FREKUENSI GEMPA BUMI VULKANIK DENGAN MEMANFAATKAN SIMULASI BENCANA LETUSAN GUNUNG BERAPI UNTUK MELATIHKAN KETERAMPILAN MENGAMBIL KEPUTUSAN SEBAGAI BASIS TINDAKAN EVAKUASI PENDUDUK | 
© 2025. Develop BY PPTIx UNESA TEAM